The feeder pillar installation will begin with preparation of the site. This may include clearing the area of any debris, levelling the ground and installing any necessary utilities.
The feeder pillar installation will begin with preparation of the site. This may include clearing the area of any debris, levelling the ground and installing any necessary utilities.
The feeder pillar will be installed in the prepared site. This may involve excavating a hole, pouring concrete, and installing the pillar.
The feeder pillar will be connected to the power source. This may involve running electrical cables from the power source to the pillar.
The streetlights will be installed on the feeder pillar. This may involve mounting the lights on the pillar and connecting them to the power source.
The streetlights will be tested and commissioned to ensure that they are working properly. This may involve turning on the lights and making sure they are providing adequate lighting.